THIS IS WORK IN PROGRESS DOCUMENT
Feature Branch Exit Criteria
The following criteria must be met before considering landing the feature branch/PR into the master.
Exit Criteria | Status/Notes |
---|---|
Test automation and CI is 100% complete with “required for version” | Some tests exist, mostly system tests, but tracking % complete pending having a test plan |
No defects with high/critical exposure or “required for version” | None, but may be more filed as testing done |
No new daily or weekly regression test failures (failures not already on master branch) |
|
All tests are passing for feature in weekly and daily regression tests |
|
Performance and scale testing executed according to test plan/required requirements. Results are reviewed and approved |
|
SDL Code scans are competed (Coverity, Bandit, Checkmarx, Snyk). For all scans, all issues have been dispositioned, and the issues that are required per SDL rules have been fixed. |
|
SAFE review executed if required | SAFE review is not needed |
Any new dependencies identified and Oked by ESAD OSPDT owner | No new dependencies added. |
Does not regress endurance testing from current master baseline with feature enabled |
|
Does not regress scale testing from current master baseline with feature enabled |
|
Manual test plans and “out-of-box experience” testing are 100% executed with “required for version”. Manual test results are recorded | Manual testing done by developer, but pending test plan for additional testing |
Feature branch is up to date with master |
|
Feature Completion Criteria
The following criteria must be met before considering the feature is complete
Exit Criteria | Status/Notes |
---|---|
Requirements are defined in SRS Jira Project | |
Design document is complete, reviewed, and approved utilizing the team template | AR: LEI HUANG |
Test plan for feature is complete, reviewed, and approved utilizing the team template. Security validate plan is also updated if applicable. | Test plan not started and blocked waiting on test resources. (AR: Ding-hwa Ho ) |
Planned software feature is 100% implemented with “required for version” | |
All user documentation updated and reviewed (e.g., admin guide, user guide) | Needs copied from the final report to user guide |
Code coverage results have been reviewed to identify gaps in testing, and test plan has been updated and executed accordingly. Functional and branch coverage each are equivalent or better than master | Not yet measured (AR: Sylvia Oi Yee Chan - please assign someone) |
Usability is evaluated and results are reviewed | Not started (AR: Sylvia Oi Yee Chan ) |